| The three spans(span
length: 125m) of the truss were fabricated and assembled in
the shop. Then, the span was separated and pulled into the loading
jetty. |

|
The block
of the intermediate support was detached from the rest
of the span and transported to the site using a floating
crane. The rest of the spans were loaded on the barge
using a high tidal difference. The barge was towed to
the site for the erection. First stage of erection was
placing of the block of the intermediate support using
a floating crane. The rest of the span was placed on
the base structure that was installed on the top of
the footings and then lifted into the desired position
using 16 sets of a 600t strand jack. After that, two
blocks were connected. |
|
 |
´ëºí·° Á¶¸³ ¹× ¼±Àû °³³äµµ
Concept of Assembly and Shipping of the Large Block
|
 |
|
´ëºí·° Á¶¸³ Assembly of the Large Block
|
|
 |
|
¼±ÀûÀå JETTY
|
|
 |
|
¼±Àû¿ë STRAND JACK Strand Jack for Shipping
|
|
 |
|
BOGGIE SUPPORT FRAME
|
|
 |
|
BOGGIE SETTING
|
|
|
|
|
|
¨ç
´ëºí·° À̵¿
BOGIE¿Í STRAND JACKÀ» ÀÌ¿ëÇÏ¿© JETTY±îÁö À̵¿ÁßÀÎ ´ëºí·°
¨è
´ëºí·° À̵¿ ¿Ï·á
JETTY±îÁöÀÇ À̵¿ °Å¸®´Â 265m, ¼Ò¿ä ½Ã°£Àº Áغñ °úÁ¤À» Æ÷ÇÔÇÏ¿© 1ÀÏÀÌ ¼Ò¿äµÇ¾ú´Ù.
¨é
±³°¢ºÎ ¼Òºí·° ºÐ¸®
JETTY±îÁö À̵¿µÈ ºí·°Àº ±³°¢ºÎ¿¡ »çÀü¿¡ °ÅÄ¡µÇ´Â ´ÜºÎ ºí·°À» ºÐ¸®ÇÑ ÈÄ BARGE¿¡ ¼±ÀüµÈ´Ù.
¨ê´ëºí·°
¼±Àû ¹× BARGEÁøÃâ
JETTY±Ô°Ý¿¡ ¸ÂÃß¾î Æ¯¼öÁ¦ÀÛµÈ BARGE(100m×27m×7m)´Â °£Á¶½Ã¿¡ JETTY·Î ÁøÀÔÇÏ¿© ¸¸Á¶½Ã¿¡
´ëºí·°À» ºÎ·Â¸¦ ÀÌ¿ëÇÏ¿© ÀûÀçÇÏ°Ô µÇ¸ç ¼öÀ§°¡ ³·¾ÆÁö±â Àü¿¡ ½Å¼ÓÈ÷ JETTY ¹ÛÀ¸·Î ÁøÃâÇÏ°Ô µÈ´Ù. |
|
|
|
Strand Jack
¼³Ä¡
|
 |
|
Truss Lifting
¹× ¿¬°á
|
 |
|
Main Truss