Transportation and Erection/Strand Jack Lifting Method
 
The three spans(span length: 125m) of the truss were fabricated and assembled in the shop. Then, the span was separated and pulled into the loading jetty.

The block of the intermediate support was detached from the rest of the span and transported to the site using a floating crane. The rest of the spans were loaded on the barge using a high tidal difference. The barge was towed to the site for the erection. First stage of erection was placing of the block of the intermediate support using a floating crane. The rest of the span was placed on the base structure that was installed on the top of the footings and then lifted into the desired position using 16 sets of a 600t strand jack. After that, two blocks were connected.
´ëºí·° Á¶¸³ ¹× ¼±Àû °³³äµµ
Concept of Assembly and Shipping of the Large Block
´ëºí·° Á¶¸³ Assembly of the Large Block
¼±ÀûÀå JETTY
¼±Àû¿ë STRAND JACK Strand Jack for Shipping
BOGGIE SUPPORT FRAME
BOGGIE SETTING
 

¨ç ´ëºí·° À̵¿
BOGIE¿Í STRAND JACKÀ» ÀÌ¿ëÇÏ¿© JETTY±îÁö À̵¿ÁßÀÎ ´ëºí·°
¨è ´ëºí·° À̵¿ ¿Ï·á
JETTY±îÁöÀÇ À̵¿ °Å¸®´Â 265m, ¼Ò¿ä ½Ã°£Àº Áغñ °úÁ¤À» Æ÷ÇÔÇÏ¿© 1ÀÏÀÌ ¼Ò¿äµÇ¾ú´Ù.
¨é ±³°¢ºÎ ¼Òºí·° ºÐ¸®
JETTY±îÁö À̵¿µÈ ºí·°Àº ±³°¢ºÎ¿¡ »çÀü¿¡ °ÅÄ¡µÇ´Â ´ÜºÎ ºí·°À» ºÐ¸®ÇÑ ÈÄ BARGE¿¡ ¼±ÀüµÈ´Ù.
¨ê´ëºí·° ¼±Àû ¹× BARGEÁøÃâ
JETTY±Ô°Ý¿¡ ¸ÂÃß¾î Æ¯¼öÁ¦ÀÛµÈ BARGE(100m×27m×7m)´Â °£Á¶½Ã¿¡ JETTY·Î ÁøÀÔÇÏ¿© ¸¸Á¶½Ã¿¡ ´ëºí·°À» ºÎ·Â¸¦ ÀÌ¿ëÇÏ¿© ÀûÀçÇÏ°Ô µÇ¸ç ¼öÀ§°¡ ³·¾ÆÁö±â Àü¿¡ ½Å¼ÓÈ÷ JETTY ¹ÛÀ¸·Î ÁøÃâÇÏ°Ô µÈ´Ù.

Strand Jack ¼³Ä¡
Truss Lifting ¹× ¿¬°á
Main Truss Á¤À§Ä¡ Á¶¸³¹× Lifting System