Substructure/Piers/Construction of Footing and Pier
 
Crack Control by Pipe Cooling, Continuous Casting up to 4,400m3, Rounding of Corners for Beauty, Consideration for Inspection VehicleWhen the heads of the cast-in-place concrete piles were arranged, the reinforcements for the footing were assembled and concrete was cast.

The reinforced concrete piers of the Bridge had the maximum height of 49.5m (from the top of the footing) and the corners of the piers were rounded (R=50m) for beauty.

The system forms (DOKA Form) were used to cast concrete. The piers were divided into 1 to 18 lots for concrete casting. The salt resistant coating was applied to prevent salt damage.