Crack Control by Pipe
Cooling, Continuous Casting up to 4,400m3, Rounding
of Corners for Beauty, Consideration for Inspection
VehicleWhen the heads of the cast-in-place concrete
piles were arranged, the reinforcements for the footing
were assembled and concrete was cast.
The reinforced concrete piers of the Bridge had the
maximum height of 49.5m (from the top of the footing)
and the corners of the piers were rounded (R=50m) for
beauty.
The system forms (DOKA Form) were used to cast concrete.
The piers were divided into 1 to 18 lots for concrete
casting. The salt resistant coating was applied to prevent
salt damage.
|