Substructure/piers/Cofferdam Construction
 
Grouting inside Sheet Piles, Casting of Infilling Concrete, Water Drain, Cobble Stone Spreading, Casting of Base Concrete After soil and sediments were removed by the air lifting, the interior of the steel pipes were filled with grout. The infilling concrete was also cast to secure the safety of the cofferdam. When the cofferdam was completely installed, the works such as water drain, cobble stone filling, and casting of the base concrete were performed to finish the erection of the temporary cofferdam.
Pack Grouting