| The guide frame fabricated
at the yard was transported to the site by a 3,000ton and a
2,000ton floating crane and installed using the guide piles.
To construct the cut-off wall, steel sheet piles(dia.800mm)
were driven around the guide frame and the gaps between the
sheet piles were filled with the pack grouting. |
| |
|
|
|
¨ç
G/FÁ¦ÀÛ ¿Ï·á
¨èG/FÁ¦ÀÛ :
Guide FrameÀº °¡¹°¸·ÀÌ ³»ºÎÀÇ Â÷¼ö ¹× ³»ºÎÀÇ ÇØ¼ö¸¦ Á¦°ÅÇßÀ» ¶§ ¿ÜºÎÀÇ ¼ö¾Ð¿¡ ÀÇÇØ ³Î¸»¶Ò(°°ü
Sheet Pile ¥÷800mm)ÀÌ ÀüµµµÇ´Â °ÍÀ» ¹æÁöÇÏ´Â ±â´ÉÀ» ÇÑ´Ù.
¨é G/F Àξç : ÇöÀåÀαٺεο¡¼ Á¦ÀÛµÈ G/FÀº 2000Åæ ¶Ç´Â 3000Åæ F/CÀ» ÀÌ¿ëÇÏ¿©
ÀÎ¾ç µÇ¾ú´Ù. |
 |
|
G/F ¿î¹Ý
Transportation of the G/F
|
|
 |
|
G/F °ÅÄ¡
Installation of the G/F
|
|
 |
|
G/F °ÅÄ¡ ¿Ï·á
Settled G/F
|
|
 |
|
°°üS/P Á¦ÀÛ
Fabrication of S/P
|
|
 |
|
°°üS/P Çן
S/P driving
|
|
 |
|
°°ü S/P °¡¹°¸·ÀÌ ¿Ï·á Completed Cofferdam
|
|
|