Concrete
casting to construct the caisson was performed by
dividing the caisson body into 13 lots. The first
five lots of concrete was poured into the steel
caisson fabricated at the yard. The remaining concrete
( for 6th - 13th lot) was cast using the form. Quantity
of concrete for 6th - 13th lot was 6,055m3 for E1
tower and 5,884m2 for W1 tower.
|