Pneumatic Caisson list
MOUNDING
MOUNDING-PROCEDURE
YARD FRAME
JACKET FRAME
JACKET FRAME-FABRICATION
JACKET FRAME-TRANSPORTATION
JACKET FRAME-INSTALLATION
JACKET FRAME-PIN PILES
FABRICATION
FABRICATION OF CUT-OFF WALL AND MIDDLE WALL
ARRANGEMENT OF REINFORCEMENTS AND INSTALLATION OF OUTFITS
LIFTING AND TRANSPORTATION
SETTING
LNITIAL BODY CONSTRUCTION
SINKING
SINKING AND EXCAVATION
EXCAVATION EQUIPMENT
EXCAVATION AND BLASTING INSIDE WORKING CHAMBER
CONSTRUCATION
REMOVAL OF EXCAVATED SOIL
SOFT GROUND TREATMENT
VINYL PLASTIC SPREADING
REMOVAL OF EXCAVATION EQUIPMENTS
SOIL BEARING TEST
CONCRETE FILLING
/
CONCRETE FILLING INSIDE Man Shaff
REMOVAL OF OUTFITS
/
CONSTRUCATION OF TOP SLAB
ANCHOR FRAME INSTALLATION