Grouting Test for the Base Plate
In order to keep the vertical precision of the tower and to keep the transmission of the reaction to the substructure uniform when fixing base plates, non-shrinkage mortar was inserted into the gap(80mm) of the base plate. The mockup test was conducted to confirm the usage of the grouting method. The test items were the infilling rate, compressive strength of filled groute, and the slope of the base plate.