Grouting Test for the Base Plate |
|
| In order
to keep the vertical precision of the tower and
to keep the transmission of the reaction to the
substructure uniform when fixing base plates, non-shrinkage
mortar was inserted into the gap(80mm) of the base
plate. The mockup test was conducted to confirm
the usage of the grouting method. The test items
were the infilling rate, compressive strength of
filled groute, and the slope of the base plate.
|
|
|
|
|
|
|
|
È£ÆÛ,
¹Í¼, ÆßÇÁ¼³ºñ
Hopper, Mixer,Pumping Facility
|
|
|
|
|
ž±âºÎÀúÆÇ,
¹éÆÄÀÌÇÁ, ÁÖÀÔ±¸ ¼³Ä¡Àü°æ Installation of Base Plate
Back-pipes and Injection Hole
|
|
|
|
|
ÁÖÀÔ¿Ï·á
Injection Completed
|
|
|
|
|
ž±âºÎÀúÆÇÇØÃ¼
Disassembly of Base Plate
|
|
|
|
|
|
|
|
| |
|
 |
|
|