Substructure/Outline
 
The deep foundation was employed because the site for the Bridge has 20M of the deposit layer and the bearing layer is generally located at the depth of 36-40M. For the riverbed, the well foundation method was applied. For the riverside, the cast-in-place concrete pile foundation and the steel pipe pile foundation were used.


Before construction